Go4Expert

Go4Expert (http://www.go4expert.com/)
-   Windows (http://www.go4expert.com/forums/windows-forum/)
-   -   Page Fault rates (http://www.go4expert.com/forums/page-fault-rates-t14702/)

Ravish 23Oct2008 08:31

Page Fault rates
 
Hello;
I am not sure if this is the right spot to post this but here goes...

I want to know how I calculate the highest acceptable page-fault rate not exceeding 100 nano's if I have a demand paging system with the following knowns:

EAT - 50 nanos
Valid page in page table
Page fault service time (PFS) = 5 milli

neo_vi 28Oct2008 15:06

Re: Page Fault rates
 
The Formula is
EAT (Effective Access Time)=(1 p) x memory access time + p (page fault overhead + [swap page out,if needed] + swap page in + restart overhead)

Where p is Page Fault Rate
0<= p <=1

Page Fault time = page fault overhead + [swap page out, if needed] + swap page in +
restart overhead

I think with this formula u can calculate


All times are GMT +5.5. The time now is 02:25.